Project 10Motorway viaduct, under construction43°41′22″N 016°41′05″E
Cetina Viaduct
- Client
- Hrvatske autoceste, motorway authority
- Location
- Dalmatian hinterland, Croatia
- Year
- 2025
- Area
- 18,200 m²
- Duration
- 38 months
- Structural engineer
- Kovač Statika, Ljubljana
01 — The projectDalmatian hinterland, Croatia, 2025
Eleven piers standing, the last spans being cast, and the reservoir still full.
The Cetina Viaduct will carry a new motorway 820 metres across a reservoir and its valley. It is on site now, with every pier complete and the deck advancing span by span.
The piers were cast in climbing formwork, up to 52 metres tall, with their heads widened to take the box girder. Two tower cranes and a launching gantry work from the eastern bank.
Precast segments are made in our yard beside the site, so the deck can keep moving through the winter without a single closure of the road below.
Site 43°41′22″N 016°41′05″E


02 — Materials and specifications04 items
- Length
- 820 m, twelve spans
- Piers
- Eleven, up to 52 m tall
- Deck
- Precast box girder segments
- Status
- Deck under construction, opening 2026