
Project 14Arched road viaduct43°48′26″N 006°13′01″E
Verdon Viaduct
- Client
- Département des Alpes-de-Haute-Provence
- Location
- Provence, France
- Year
- 2021
- Area
- 11,400 m²
- Duration
- 32 months
- Structural engineer
- Kovač Statika, Ljubljana
01 — The projectProvence, France, 2021
Arches that grow out of the piers, so the bridge reads as one line across the gorge.
The Verdon Viaduct carries a regional road 560 metres across a river gorge, replacing a narrow stone bridge that could no longer take heavy traffic.
Each pier flares into the deck in a single curve, cast in white concrete made with local limestone aggregate so the bridge matches the cliffs around it.
A line of light set into the underside of every arch makes the viaduct visible from the valley at night without lighting the sky.
Site 43°48′26″N 006°13′01″E


02 — Materials and specifications04 items
- Length
- 560 m, seven arched spans
- Structure
- Post-tensioned concrete, flared piers
- Concrete
- White cement, local limestone aggregate
- Lighting
- Concealed LED line under each arch
Next project — 15Industrial · Eindhoven, Netherlands
Brightwater Works

